Post a listing
Hybrid system: roof and facade

Hybrid solar system 600 kW for a site in Singapore

600 kW solar power plant with backup power for a commercial building: up to 900,000 kWh per year and a 30–50% reduction in electricity bills.

About the project

In Singapore, we implemented a hybrid system on the roof and facade of an industrial-commercial building. The station operates in tandem with the city grid in an on-grid scheme and is supplemented with backup power, so the business is less dependent on tariffs and outages.

The system includes: high-efficiency monocrystalline panels, inverters with up to 98% efficiency, energy storage equipment, as well as monitoring with remote management. The modules are oriented to receive the maximum light according to the city's climate conditions.

Work process: project documentation considering grid integration, procurement of equipment according to international standards, installation of panels and inverters, connection to the city grid and test launches, configuration of solar energy usage algorithms, final inspections with obtaining certificates and permits.

According to calculations, investments pay off in 4–6 years, after which the station provides pure savings.